2023/2024 | Saídas de Campo no Arouca Geopark
Summary: Nowadays, the wind power is considered one of the most important natural sources of energy for being renewable, and it has been used since ancient times. Currently it is used, among others, for the electric power supply, making a significant contribution to reducing the environmental impact and the sustainable development. This field trip will guide you through the Serra da Freita Wind Farm, and will help you to understand the transformation of the wind power into electric power. It also includes the visit to the geosite of Detrelo da Malhada Panoramic, from where you’ll have a privileged view over the Arouca town.
Region | Starting / arrival point: Freita Mountain | Serra da Freita Wind Farm building
Length / Level of difficulty / Duration: 1000 m / easy to moderate / 2h30m
Points of interest: Serra da Freita | Geosite Panoramic of Detrelo da Malhada (G1) and Panoramic Geosite of Costa da Castanheira (G10) / Panoramic floor of RMA, Serra da Freita Wind Farm
Price (per student): 5 Euros (free for accompanying teachers)
Promoter / Reservation: AGA – Associação Geoparque Arouca; The reservations are made through the following form, that must be filled in and submitted 15 working days prior to the event. For further information, please contact us at 256 940 254 or geral@aroucageopark.pt.
Notes: